Reports typically delivered in 7–14 working days

020 3797 3053  |  Mon to Fri: 9am to 5pm

Chartered & Independent Fire Engineering

Fire Strategy

Fire Strategy for HMO Properties

Chartered fire strategy reports for houses in multiple occupation. Required for HMO licensing, planning applications, and building control. Addressing means of escape for mixed tenancies, room-by-room compartmentation, and fire detection across London and the UK.

4,000+ projects delivered
7 to 14 working day turnaround
Chartered engineers, up to £5M PI
Discuss your project
We respond to all enquiries within 1 to 2 working days.
Get a Quote 020 3797 3053
Turnaround7 to 14 working days
Response time1 to 2 working days
CoverageLondon & UK wide
PI insuranceUp to £5M
4,000+
Projects Delivered
30+ yrs
Collective Experience
7–14
Working Day Turnaround
UK Wide
Coverage
Chartered
Independent Practice
up to £5M
Professional Indemnity
Fire Strategy for HMO Properties

What makes HMO fire strategy different from other residential buildings

A house in multiple occupation presents a distinct set of fire safety challenges that a standard residential fire strategy does not address. Occupants of different tenancies share means of escape — corridors, stairways, and final exit routes — without the coordinated response that would be expected in a single-household dwelling or a purpose-built block. Each room is effectively a self-contained sleeping area, which means compartmentation, detection, and means of escape must be designed around the individual room as the unit of risk.

Fire strategy reports for HMO properties are required in a range of circumstances: where planning permission is sought for a change of use from C3 (dwelling) to C4 (small HMO) or sui generis (large HMO); where a local authority HMO licence application requires evidence of fire safety compliance; where building control requires a fire safety strategy as part of a conversion or refurbishment; or where a property is being sold and the purchaser's solicitors or lender require documentation of the fire safety design rationale.

The applicable standards depend on the size, height, and construction of the property. For most HMO conversions, Approved Document B and BS 9991:2015 (fire safety in the design, management and use of residential buildings) are the primary reference documents. Where the HMO is in a larger building or involves a material change of use, additional considerations under the Building Safety Act 2022 may apply.

Related Services

You may also need

Get Started

Get a quote for your HMO fire strategy

We respond to all enquiries within 1 to 2 working days with a clear scope, programme, and fee proposal.

Common Questions

Frequently asked questions

When is a fire strategy required for an HMO?
A fire strategy is commonly required in four situations: when applying for planning permission for a change of use from C3 to C4 or sui generis HMO; when a local authority requests fire safety documentation as part of an HMO licence application; when building control requires a fire safety strategy as part of a conversion or refurbishment; and when a lender or purchaser's solicitors require evidence of fire safety compliance as part of a sale or remortgage. In London, Article 4 directions in many boroughs mean that even small HMO conversions trigger a formal planning application, at which point a fire strategy may be required.
What standards apply to HMO fire strategies?
The primary reference documents for most HMO fire strategies are Approved Document B and BS 9991:2015 (fire safety in the design, management and use of residential buildings). For larger or higher-risk HMOs, additional guidance under BS 9999 and the Building Safety Act 2022 may apply. Local authority licensing standards — which vary by borough and district — also set minimum fire safety requirements, and the fire strategy must demonstrate compliance with the applicable local standard as well as the statutory requirements.
How long does a fire strategy for an HMO take to produce?
Most HMO fire strategy reports are delivered within 7 to 14 working days of receiving all required information, including architectural floor plans, a confirmed room schedule, and details of any existing fire protection measures. We confirm the programme and fee at the time of instruction. Our dedicated fire engineering team responds to all initial enquiries within 1 to 2 working days.
Do you cover HMOs across London and the UK?
Yes. We are based in London and carry out HMO fire strategy commissions across the whole of the UK. We are familiar with the licensing standards operated by London boroughs and local authorities across England, Scotland, and Wales, and tailor each report to the applicable local requirements as well as national statutory guidance.
Accreditations & Memberships
SSIP Accredited
SSIP Accredited
Institution of Mechanical Engineers
Institution of Mechanical Engineers
Homes England Approved
Homes England Approved
Constructionline Gold Member
Constructionline Gold Member
IIRSM
IIRSM
Institution of Fire Engineers
Institution of Fire Engineers
IOSH
IOSH
Social Value
Social Value
Fire Protection Association
Fire Protection Association
Acclaim Accreditation
Acclaim Accreditation
Safety and Reliability Society
Safety & Reliability Society
Chartered Engineer
Chartered Engineer
Fire Industry Association
Fire Industry Association
Institute of Fire Safety Managers
Institute of Fire Safety Managers
Get a Quote 020 3797 3053