Reports typically delivered in 7–14 working days

020 3797 3053  |  Mon to Fri: 9am to 5pm

Chartered & Independent Fire Engineering

Fire Strategy

Fire Strategy for Flats and Apartment Blocks

Chartered fire strategy reports for flats and apartment blocks. Required for planning applications, building control submissions, and BSR gateway compliance. Addressing means of escape, compartmentation design, and fire safety engineering for residential buildings across London and the UK.

4,000+ projects delivered
7 to 14 working day turnaround
Chartered engineers, up to £5M PI
Discuss your project
We respond to all enquiries within 1 to 2 working days.
Get a Quote 020 3797 3053
Turnaround7 to 14 working days
Response time1 to 2 working days
CoverageLondon & UK wide
PI insuranceUp to £5M
4,000+
Projects Delivered
30+ yrs
Collective Experience
7–14
Working Day Turnaround
UK Wide
Coverage
Chartered
Independent Practice
up to £5M
Professional Indemnity
Fire Strategy for Flats and Apartment Blocks

What a fire strategy for a residential block needs to address

A fire strategy for a block of flats must address the specific characteristics of the building: how many storeys it has, how many occupants it serves, whether it has a single staircase or multiple, and what the construction type is. These variables determine the evacuation strategy — whether the building operates a stay-put policy, a simultaneous evacuation, or a phased evacuation — and from that, the compartmentation standard, detection and alarm provision, and smoke control requirements all follow.

Fire strategy reports for flats are required at multiple stages of a project. For new-build residential blocks, a fire strategy is required at Gateway 1 (planning) and Gateway 2 (pre-commencement) under the Building Safety Act 2022, and must be submitted to the Building Safety Regulator for higher-risk buildings. For conversions of existing buildings into flats, building control requires a fire strategy demonstrating how the conversion achieves compliance with Approved Document B. In London, London Plan Policy D12a requires a fire safety statement for relevant planning applications, of which the fire strategy is the core technical document.

The applicable standards depend on the height and occupancy of the building. For buildings up to 11 metres, Approved Document B sets the baseline. Between 11 and 18 metres, additional requirements apply including protected lobbies to stairwells and enhanced compartmentation. Above 18 metres, buildings are classified as higher-risk under the Building Safety Act 2022 and must be registered with and approved by the Building Safety Regulator. BS 9991:2015 is the primary code of practice for all residential fire safety design.

Related Services

You may also need

Get Started

Get a quote for your residential block fire strategy

We respond to all enquiries within 1 to 2 working days with a clear scope, programme, and fee proposal.

Common Questions

Frequently asked questions

When is a fire strategy required for a block of flats?
A fire strategy is required at Gateway 1 (planning) and Gateway 2 (pre-commencement) for higher-risk residential buildings under the Building Safety Act 2022. For buildings under 18 metres, building control typically requires a fire strategy as part of the building regulations submission for new-build or conversion projects. In London, London Plan Policy D12a requires a fire safety statement for relevant planning applications, which incorporates the fire strategy as its technical foundation.
What standards apply to fire strategies for residential blocks?
The primary standard is BS 9991:2015 alongside Approved Document B. For higher-risk buildings above 18 metres, the Building Safety Act 2022 and associated secondary legislation apply, requiring registration with and approval from the Building Safety Regulator. London Plan Policy D12a sets additional requirements for relevant planning applications in Greater London. The fire strategy must demonstrate compliance with all applicable standards for the specific building height, construction type, and occupancy.
How long does a fire strategy for a block of flats take to produce?
Most fire strategy reports for residential blocks are delivered within 7 to 14 working days of receiving all required information, including architectural drawings, a floor-by-floor schedule of accommodation, and details of any existing fire protection measures. Complex higher-risk buildings or phased developments may require a longer programme. We confirm the programme and fee at the time of instruction and respond to all initial enquiries within 1 to 2 working days.
Do you cover residential blocks across London and the UK?
Yes. We are based in London and carry out fire strategy commissions for residential blocks across the whole of the UK, including higher-risk building submissions to the Building Safety Regulator. We are familiar with the requirements of building control bodies and planning authorities across England and tailor each report to the specific regulatory context and height classification of the building.
Accreditations & Memberships
SSIP Accredited
SSIP Accredited
Institution of Mechanical Engineers
Institution of Mechanical Engineers
Homes England Approved
Homes England Approved
Constructionline Gold Member
Constructionline Gold Member
IIRSM
IIRSM
Institution of Fire Engineers
Institution of Fire Engineers
IOSH
IOSH
Social Value
Social Value
Fire Protection Association
Fire Protection Association
Acclaim Accreditation
Acclaim Accreditation
Safety and Reliability Society
Safety & Reliability Society
Chartered Engineer
Chartered Engineer
Fire Industry Association
Fire Industry Association
Institute of Fire Safety Managers
Institute of Fire Safety Managers
Get a Quote 020 3797 3053